Laserfiche WebLink
._._..,~ <br /> <br /> <br />P.O. Bo: L7 <br />Founltln, CO <br />tOtiy <br />_~ <br />~ Cdl <br />y~aoexaoxo <br />For All <br />Yeur E~rihly NoWd <br />MINING PLAN FOR RECENTLY PERMITTED SOUTH PARCEL: <br />Mining activities will occur on the 21.90 acres as a clean up and <br />reclamation phase to finish that portion previously mined by passed <br />owners. Also mining will begin on that portion of land approved by <br />the Board of County Commissioners on May 17, 1990. Mining will <br />begin on tl~e central Nort}~ side and Northwesterly portion, and proceed <br />South, West and East leaving that portion fronting Interstate 25 <br />undisturbed until the last phase of mining and reclamation. <br />The mining operation to be conducted will be a surface sand and gravel <br />extraction operation. The operation will consist of stripping and stock- <br />piling top soil; removing the sand and gravel; leveling the mined areas <br />and re-vegetating in accordance with the enclosed reclamation plan. <br />Access to the proposed area will be provided by existing haul roads <br />already located within Midway Sand & Gravel, Inc. The haul roads will <br />be extended as needed to the areas being mined. The haul roads will be <br />properly maintained by Midway Sand & Gravel, Inc. during the life of the <br />operation. The haul distance from the mining site to the scale is <br />approximately 3/4 to 1} miles. <br />To alleviate any dust problems on the access roads, truck speeds will be <br />kept under fifteen miles per hour. All road surfaces are graveled. We <br />will use a water truck with a spray bar to control any dust problem, in <br />accordance with our existing mining plan. <br />The mining equipment to be used is all portable, and will not require <br />any public services such as water, electricity, or gas. <br />AJ.1 corners of said property are marked with a steel stake and ribbon. <br />