My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-03-06_REPORT - M1977493
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977493
>
2006-03-06_REPORT - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2019 8:37:56 AM
Creation date
11/27/2007 12:19:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
Report
Doc Date
3/6/2006
Doc Name
Annual Fee/Report/Map
From
Climax Molybdenum Company
To
DMG
Permit Index Doc Type
Annual Fee / Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT Af3 -East Side Channel and 2 Dam Spillway <br />• Management 01 impeded waters and clean stormwater runoff is required from the Robinson Pond area <br />A system o/ handling both sources was developed for Gosure of the Robinson Pond area. Addeionally <br />final closure requires that a passive system be constn,ded to manage water from the pond drainage <br />Darin and the decant system be Gored. <br />The East Side Channel was constructed along the east srde of the valley by cutting iMo the nahve slope <br />on one side and tailing on the other Water control structures were included to keep impeded waters <br />separate from Gean water in the future. Native material from the excavation was used to cover the (ailing <br />in the excavation and excess material was used for capping on Robinson Pond. <br />The 2 Dam Spillway consists a 42' and a 82' HDPE pipeline through 2 Dam to route water to Tenmile <br />Tailing Pond via gravity <br />
The URL can be used to link to this page
Your browser does not support the video tag.