Laserfiche WebLink
ermittee Name: Lakewood Brick and Tile Co, Page 2 <br />Permit No: M-79-045 <br />Operation Name: Church Pit <br />Anniversary Date: 02/28/2005 <br />(3) Clay -Mining will continue in Stage I or Stage II, no new azea will be disturbed this yeaz <br />because we aze mining in the azea stripped in previous yeazs. We will continue to deepen the <br />bottom of the mine into the clay veins exposed in the past and advance the face to the north as <br />approved in the reclamation plan. Processing will continue in the Clay Plant Site Area in <br />Stage 0 (purple). The clay storage on the east side of Stage II continues (tan). It is blended <br />with the clay from this mine at our brick plant in Lakewood. <br />Gravel -Mining will continue in Stage A and will progress to the east and north. Processing <br />will be done in the azea east of the old Clay pit. As the perimeter of the mine is reached <br />sloping will begin as approved in the approved plan. Since the Rocky Flats Pit opened this <br />yeaz the gravel miner begin to mine thrv the east side of the Church Pit into the Rocky Flats <br />Pit as approved in the permit. No sloping will be required along the line sepazating the <br />mines. Growth medium will be stockpiled along the mine perimeter for use in reclamation. <br />(4) No reclamation is called for during the next yeaz. However, backFilling will continue on the <br />slopes in the old clay pit. The waste material from gravel processing will be used to slope the <br />south mine slope from the original level to the pit floor. We will continue to fill the north <br />slope of the old clay pit and begin to do sloping on the east side, if the gravel operator <br />removes the overburden pile next to the face on that side. If the opportunity to sell rock from <br />the southwest overburden pile occurs, that removal will continue as well. <br />(5) CURRENT CONTACT <br />Thomas J. Murray i303- 238-5313 <br />1325 Jay St. FEDERAL TAX ID. # <br />Denver, Co 80215 <br />The effective date of all information contained herein is Februazy 2, 2005. Enclosed is a <br />check for $688.00 to cover the Annual Fee. Please date stamped the copy attached to indicate your <br />receipt of this Annual Report, and the Annual Fee. <br />Respectfully Submitted, <br />President <br />COMPANY <br />cc Charles McKay -Church Ranch <br />Perry McKay -Church Ranch <br />Siri Olsen, Attorney at Law <br />Paul Tuttle - Centemial Aggregates <br />Pat O'Connell, Jefferson County Geologist <br />Steve O'Brian, Environment, Inc. <br />file <br />O:\WPBIDOCSVINNUALBLLAKEWOODWIlA606.M <br />