Laserfiche WebLink
.. .. <br />~4 ' .. <br />Februazy 22, 2005 <br />Dr. Hazry Posey <br />Division of Minerals and Geology <br />Minerals Section <br />1313 Sherman Street, Suite 215 <br />Denver, Colorado 80203-2273 <br />RECEIVEp <br />FEB 15 2205 <br />Division of Minerals and Geology <br />Deaz Dr, Posey: <br />Re: Lakewood Brick and Tile Co. -Church Pit, Annual Report <br />MLRB Permit r>` M-79-045, Anniversazy Date 2/28/05 <br />FEDERAL TAX ID. // <br />This annual report addresses mining of both material being removed from the site. Each is <br />mined by a different operator under this single permit. This pit HAS NOT been granted a Temporazy <br />Cessation and it HAS operated more than 180 days this yeaz. The approved bond amount is $84,200 <br />covering 75.74 acres ±, and the facility has seven mining and reclamation phases. Please refer to the <br />attached 2004-0225 Annual Report Map for the azeas discussed in this text. <br />We will deal specifically with the Annual Report requirements as outlined in Rule 1.15 of the <br />Rules and Regulations and those noted in the annual letter. <br />(1) Clay - No new area was disturbed by the clay mining operation this yeaz. We continued to <br />mine deeper on approximately 2.01 acres (//~ on the land previously disturbed (blue) north of <br />the ditches in Stage II. Approximately 23.21 acres is disturbed by the clay operation in <br />Stages O, I and II. This included the old clay mined azea south of the ditches, the Clay Plant <br />Site (purple) and the storage area (tan). <br />Gravel - A total of 12.75 acres has been stripped in Stage A to prepaze it for mining <br />(orange). Mining continues place in the southeast quadrant of Stage A marked with the <br />following hatching symbol (/!n, it cover 4.53 ac. ±. The gravel operation has disturbed <br />23.03 acres ± in the mine (yellow). Mining continued deeper into the deposit and expanded <br />to the eastern permit boundazy. Some waste rock was removed for use by the mineral owners <br />from the southwest prelaw stockpile azea. <br />(2) No reclamation was required this yeaz. Filling continued on the old clay mining area in the <br />green azeas shown in Stage O (green). No additional reclamation is required until mining for <br />both materials is c any given stage. Construction of the required sight berm <br />continued along the south side of the mine in Stages A & D and began on the northwest side <br />of Stage C (magenta). This is required by the county permit. <br />