Laserfiche WebLink
2.0 Semi-annual Subsidence Monitoring Report (Mid-year Report) <br />2.0.1 Report Timing <br />This report will be submitted to the Division by August 15, of the calendar year. <br />and shall reflect data collected duringthe first part of the year. <br />2.0.2 Report Contents <br />The report contents will include a narrative discussion which addresses <br />survey schedule, mining advance, subsidence results, and subsidence <br />related visual effects. A table addressing the subsidence monitoring data <br />will also be included. The table will show northing, Basting, pre-mining elevation, <br />survey elevations of the current monitoring, the previous report elevations, and <br />subsidence for the current reported period and total subsidence. <br />