My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP10055
DRMS
>
Back File Migration
>
Report
>
REP10055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:39:31 PM
Creation date
11/27/2007 12:18:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Report
Doc Date
2/24/2000
Doc Name
1999 AHR
Annual Report Year
1999
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTRODUCTION <br />The 1999 Annual Hydrology Report for the Bear Coal Company, Inc., Bear No. 3 <br />Mine is hereby submitted in accordance with the rules and regulations of the Division of <br />Minerals and Geology. <br />The Bear No. 3 Mine is owned and operated by Bear Coal Company, Inc. The <br />mine is located along the North Fork of the Gunnison River approximately one quarter <br />mine east of Somerset, Colorado, along Colorado State Highway 133. <br />The Bear No. 3 Mine ceased all coal production on November 13, 1996 and the <br />portals were sealed in January 1997. During 1997 reclamation of the mine site was <br />initiated. The stacking tube, reclaim tunnel and truck loadout bin were dismantled and <br />removed from the site. The mine portals and mine access road were backfilled and <br />seeded. The two warehouses, shop, substation and ventilation fan were dismantled <br />and removed form the site. <br />On November 17, 1997 the DMG was notified of a slide located immediately <br />west of the reclaimed Bear No. 3 Mine portals. The slide became active on Saturday, <br />November 15`h. Debris from the slide flowed onto the old coal stockpile pad (west of <br />the the reclaimed stacking tube) and into the North Fork of the Gunnison River south of <br />the mine access bridge. Shortly after the slide occurred, water started flowing from the <br />east side of the slide scarp. <br />A treatment pond was constructed during May and June 1999 in accordance the <br />plan presented on Drawing 11-4 (rev. 9/23/99). The mine seepage water is piped into <br />• the pond, passively treated and then discharged though ouffall 001. The effectiveness <br />of the treatment pond should improve as the vegetation in and around the pond <br />matures. <br />-1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.