Laserfiche WebLink
20. Culvert MAC 3 -dump rock about 25' upstream from culvert to make small check dam, <br />. repeat at 50' and 75' upstream of culvert. <br />21. Check dams -add rock to spillways on dams 9 and I1 (spillways either side of the <br />completely reconstructed spillway with the dark gray limestone). <br />22. Terraces: <br />Terrace 7 - clean/reshape northwest (down drain of small trees) where over-topping <br />occurred; clean reshape just down-gradient of topsoiled area and where over-topping. <br />Terrace 8 - clean reshape just down-gradient of topsoiled area where over-topping <br />occurred. <br />Terrace 9 -clean from road to first curve {in area and up-gradient of where over-topping <br />occurred. <br />Between Terraces 7-10 -breakup gullies (cross-contour furrow) below points where <br />over-topping occurred. <br />• <br />U <br />