Laserfiche WebLink
~ .1 aull Feld rl (ime <br />® 2003 it mural Reelamalian Report <br />Fe6rnary l3, 2004 <br />Ynge 2 <br />• Excavated septic tank, pumped out and disposed of residual sludge and sanitary waste <br />water (licensed pumping service), rinsed tank and disposed of rinsate, crushed and buried <br />septic tank, and topsoiled and revegetated disturbance area <br />• Moved utility building off Vento lands to location adjacent to road near truck tunnel <br />• Conver[ed North Dewatexing Well to monitoring well and reclaimed 0.4 acre section of <br />associated road <br />• Completed minor regrading and soil material replacement in the regraded Pond 3 area and <br />installed additional sik fence along property boundary <br />• Established contour furrows in vicinity of reclaimed portal area to control drainage and <br />erosion <br />• Cleaned out sediment accumulation from refuse pile perimeter ditch <br />• Removed and disposed of broken concrete material previously used as riprap in a portion <br />of the Magpie Creek diversion. Material was replaced with suitable rock riprap materials <br />• Repaired minor erosion and riprapped inlet to Pond 5 off of mine entrance road <br />• Spra}'ed rninor occurrences of whitetop and thistle in area north of reclaimed portals <br />Map 1, Southfield Reclamation Map, outlines the general location, extent, and status of site <br />reclamation and maintenance activities completed during 2003, as well as prior reclamation <br />activities. These activities are described in more detail in the following sections. <br />1.0 MINING, DISTURBANCE, AND BACKFILLING, GRADING, AND SOIL <br />MATERIAL REPLACEMENT <br />No mining occurred and no additional areas were disturbed during [he reporting period. Final site <br />reclamation, initiated in August 2001 and completed in Augus[ 2002, included the following <br />activities, conducted in accordance with the approved reclamation plans (Section 2.05.4 of <br />approved DMG Permit): <br />• Removal and salvage of all usable equipment and supplies <br />Sealing and backfilling of mine portals <br />• Disassembly and salvage or demolition of all surface s[ructures and facilities <br />• Demolition of concrete pads and foundations <br />• Disposal of demolition debris in approved locations <br />