My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP09262
DRMS
>
Back File Migration
>
Report
>
REP09262
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:38:56 PM
Creation date
11/27/2007 12:05:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080
IBM Index Class Name
Report
Doc Date
1/22/2007
Doc Name
2006 Annual Reclamation Report
From
Savage and Savage
To
DRMS
Permit Index Doc Type
Annual Reclamation Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Savage and Savage Environmental <br />practical solutions far environmental issues <br />461 O Haystack Drive 9'10 674 8080 telephone <br />Windsor, Colorado 80550 970 674 8088 facsimile <br />savageandsavage®earth I in k.net <br />January 16, 2007 <br />Tom Kaldenbach, Environmental Protection Specialist <br />Colorado Division of Minerals and Geology <br />1313 Sherman Stree[, Room 215 <br />Denver, Colorado 80203 <br />RECE1"~/E~ <br />JAN 'L 'L 2001 <br />Division of Rec+amabon, <br />Mining and Safety <br />Re: 2006 Annual Reclamation Report; Cazbon Junction Mine (CDRMS file C-92-080) <br />Dear Mr. Kaldenbach: <br />The following information is submitted to fulfill the requirements of Rule 2.04.13 for the <br />annual reclamation report for the Carbon Junction Mine. <br />a). The name and permit number of the mine and the name and address of the permittee <br />are: <br />Carbon Junction Mine (CDRMS permit number C-92-080) <br />Oakridge Energy, Inc. <br />4613 Jacksboro Highway <br />Wichita Falls, Texas 76301 <br />telephone (940) 322-4772 <br />b). No additional acreage was disturbed in 2006. None of the reclamation activities <br />undertaken in 2006 entailed additional disturbance. <br />c). Backfilling and final grading took place at the North Pit, North Pit Haul Road, Topsoil <br />Stockpile #2, areas within the Previously Reclaimed Spoils Area, South Pit Drill Pad, <br />Equipment Yazd, and ancillary areas within the Carbon Junction Mine during 2006. <br />d). Topsoil replacement took place at the North Pit, North Pit Haul Road, Topsoil <br />Stockpile #2, azeas within the Previously Reclaimed Spoils Area, Carbon Junction Canyon <br />reconstruction, South Pit Drill Pad, Equipment Yazd, and ancillary areas during 2006. <br />2006 Carbon Junctbn MineAnnual Reclamation Report Page 1 <br />CDRMS PermitC-92-080 <br />
The URL can be used to link to this page
Your browser does not support the video tag.