My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP08978
DRMS
>
Back File Migration
>
Report
>
REP08978
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:38:43 PM
Creation date
11/27/2007 12:01:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
9/24/2004
Doc Name
Construction Quality Assurance Report
From
CC&V
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase II-III Summary No. 1 Page 2 043-2170 <br />Field Monitoring and Testing Activities <br />Golder observed construction acfivities associated with Phase IVc earthworks. All construction <br />materials and soil materials placed were verified as suitable, and construction methods were in <br />accordance with project specifications. <br />Laboratory Tests <br />Golder obtained no QA samples associated with the Phase II-III extension. Golder plans to sample a <br />minimum of one QA structural fill sample, one soil liner fill sample, and one drain cover fill sample <br />during construction of the extension. <br />Meetines <br />CC&V held a Weekly Contractors' meeting on September 8, 2004. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. The next weekly meeting will be held on <br />September 14, 2004 at 10:00 AM. <br />Golder Personnel On-Site <br />A sununary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment A. <br />Sincerely, <br />Ron DiDonato <br />Project Resident <br />rt~~u-m~s~~x~oss~~x. ii zoos Golder Associates inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.