My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP08978
DRMS
>
Back File Migration
>
Report
>
REP08978
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:38:43 PM
Creation date
11/27/2007 12:01:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
9/24/2004
Doc Name
Construction Quality Assurance Report
From
CC&V
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. = GOI(~C'T <br />-Associates <br />September 15, 2004 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303)980-0450 <br />(303)985-2080 <br />Golder Project No.: 043-2170 <br />RE: Sununary No. l: September 5 through September 11, 2004 <br />Cresson Project Phase II-III Extension Construction Quality Assurance <br />Dear Mr. Roberts: <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase II-III Extension <br />Construction Quality Assurance (CQA) services performed for the Cresson Project during the period of <br />September 5 through September 11, 2004. <br />The weather during this reporting period was clear to cloudy. Approximate daytime ]ow <br />temperatures ranged from 35° F to 50° F, and highs ranged from 59° F to 79° F. Weather <br />observations were made on seven days of this seven-day reporting period. <br />Construction Smopsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase IVc <br />construction. Ames conducted Phase II-III construction activities on three days of this seven-day <br />reporting period (September 8 through September 10, 2004). <br />Phase II-III Extension <br />Ames began cut to fill activities associated with the extension project located at the southwest comer of <br />the Phase II and Phase III edge of VLF. <br />Ames continued production of bentonite-amended SLF for the Phase II-III extension at the screen plant <br />and pug mill located above the Ames materials yard. Ames also continued production of Drain Cover <br />Fill (DCF) material at the screen plant by the secondary crasher. <br />Phase II-III 1 September 5-September 11, 2004 043-2170 <br />
The URL can be used to link to this page
Your browser does not support the video tag.