Laserfiche WebLink
s <br />• <br />-2- <br />During this past year, we started reclamation work on our old <br />No. 2 settling pond. It was neutralized with hydrated lime and <br />peat moss. No core drilling took place during this period and <br />only very limited underground geologic mapping took place on a <br />contract basis. Reclamation of surface core drill sites was <br />accomplished the previous year and mentioned in our report. We <br />feel no significant changes took pace during the year which <br />would affect or alter the terms of p r existing permit. <br />~. <br />s S. endricks d to <br />