My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP08870
DRMS
>
Back File Migration
>
Report
>
REP08870
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:38:38 PM
Creation date
11/26/2007 11:59:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Report
Doc Date
11/1/1996
Doc Name
COAL MINE WASTE BANK DESIGN FOR THE SANBORN CREEK MINE
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 6.0 USE OF THIS REPORT <br />This report was prepared for the exclusive use of OXBOW and its consulting engineers for <br />specific application to the design of the site as it relates to the geotechnical aspects discussed <br />herein. The data and report should be provided to prospective contractors for their <br />information, but our report, conclusions, and interpretations should not be construed as a <br />warranty of actual subsurface conditions. <br />Within the limitations of scope, budget, and schedule, the analyses, conclusions, and <br />recommendations presented in this report were prepared in accordance with generally accepted <br />professional geotechnical engineering principals and practices. We make no other warranty, <br />either express or implied. These conclusions and recommendations were based on our <br />understanding of the project as described in this report and the site conditions as observed at <br />the time of our explorations. Unanticipated soil conditions are commonly encountered during <br />construction and cannot be fully determined by retrieving soil samples from explorations. Such <br />unexpected conditions sometimes require that addrtonal expense be made to attain aproperly- <br />constructed project. Therefore, some contingency fund in the project budget is recommended <br />to accommodate such potential extra costs. <br />If actual conditions appear to be different from those described in our report or if project <br />details change, WESTEC should review any change in conditions and design details to <br />determine the applicability of the conclusions and recommendations in this report. The <br />conclusions and recommendations contained in this report shall not be considered valid unless <br />the changes are reviewed by WESTEC and the conclusion of this report modified or verified <br />in writing. <br />u <br />96266/1424.RPT Coel Mine Weete Bank Dssign for the Sanborn Creek Mine <br />October 1999 WESTEC, Inc. 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.