Laserfiche WebLink
• 5.0 RECLAMATION <br />Reclamation for the coal mine waste bank is planned contemporaneously during operations at <br />the completiori of every 10 vertical feet of coal mine waste placed, as described in Section <br />4.1.5. At this time, the slope is planned to be covered with 4 feet of suitable material and <br />revegetated. The cover will consist of the best available non-toxic and non-combustible <br />materials, as required by Rule 4.10.4151. The cover material will be top dressed with topsoil <br />and revegetated, this will improve runoff and erosion conditions. Final reclamation extends <br />to the final pile height and will include the recontouring and vegetation of all haul roads. The <br />disturbed area will be returned as close as possible to its original state considering vegetative <br />growth and hydrology. <br />• <br />• <br />95265/1424.RPT Coel Mine Weete Benk Deeipn for the Sanborn Creek Mine <br />October 1898 WESTEC, Inc. 22 <br />