My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP08826
DRMS
>
Back File Migration
>
Report
>
REP08826
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:38:36 PM
Creation date
11/26/2007 11:58:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
2/14/1992
Doc Name
1991 4TH QUARTERLY WASTE DISPOSAL AREA INSPECTION REPORT NEW WEST RIDGE PILE
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />;, <br />~ f~'~/ ~ III IIIIIIIIIIIIINI <br />ORCI3ARD VALLEY MINE <br />~`~~ QUARTERLY WASTE DISPOSALAREA INSPECTION REPORT <br />NEW WEST RIDGE PILE <br />Item Y/N Comments <br />1. Quantity of waste material added to N There was no gob hauled to the waste disposal <br />waste disposal area this quaver? pile this quaver. The uppermost 12 feet of gob <br /> was exposed For shipment to the Nucla power plant. <br />2. Waste material deposited and compacted N Approximately half of the uppermost 12 feet of exposed <br />in 24" lilts? gob was removed and shipped out. <br />3. Drainage alterations constructed? Y Ditches were established on top of exposed gob pile <br /> so drainage to toe ditches would occur. A soil berm was <br /> maintained around the perimeter of the exposed gob <br /> area to protect outslopes and direct drainage to ditches <br /> at the toe of the pile. <br />4. Present height of waste material? Highest height approximately65.7 feet. <br />5. New bench constructed? N <br />6. Refuse material outslope placed at Y Slopes were checked for proper placement periodically <br />1 V:2H outslope'? during construction. <br />7. Adequate drainage on top of completed Y Ditches were established on top of the exposed gob to <br />fill? to ensure proper drainage from the top of the pile. <br />S. Bench drainageadequate? Y Bench drainage was maintained throughout gobshippin <br /> operations. <br />9. Outslopes covered with 4' non-toxic. Y <br />non-combustble material? <br />10. Berms constructed on outslopes? Y <br />I1. Evidence of structural detects? N <br />
The URL can be used to link to this page
Your browser does not support the video tag.