My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP08807
DRMS
>
Back File Migration
>
Report
>
REP08807
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:38:36 PM
Creation date
11/26/2007 11:58:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
12/31/1993
Doc Name
REVIEW OF DRAFT SUMMARY REPORT FOR OCT 93 THIRD PARTY MONITORING TRIP
From
DMG
To
RCG HAGLER BAILLY INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- III IIIIIIIIIIIIIIII ~'~ <br />~ 999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY op~co~ <br />Department of Natural Resources a~' -~ q <br />~~ii ~~ <br />1313 Sherman SI., Room 215 <br />Denver, CO 80203 ~' <br />Phone: 13031 866-1567 rays ~ <br />FA%:13031 83 2-81 06 <br />Roy ROmer <br />Governor <br />michael R. long <br />Division Director <br />December 31, 1993 <br />Ann Maest, Ph.D <br />RCG/Hagler Bailly, Inc. <br />P.O. Drawer O <br />Boulder, CO 80306-1906 <br />RE: Review of Draft Summary Report for October 1993 Third-Party <br />Monitoring Trip <br />Dear Dr. Maest: <br />The Division received the above-cited report on December 29. Prior to <br />releasing this report please consider addressing the Following few <br />discrepancies. <br />1. Acceptance criteria for duplicate analyses were not met for total <br />cyanide analyses of samples from the upper and lower tailing <br />impoundments and re-analysis of these samples took place after the <br />EPA-recommended holding time. <br />If this situation has led to invalid results, it should be stated <br />so more directly in the conclusions, and recommendation should be <br />made that new samples be collected and new analysees performed. <br />BMRI should not have to bear the cost of the new analyses, except <br />as set forth in their contract with Core Labs. In the event these <br />points need to be re-sampled, RCG/HBI should discuss with the <br />Division and BMRI whether RCG/HBI will conduct the sampling. <br />2. Total cyanide analysis of Sample "Well M-9" was conducted two days <br />after the holding time. <br />If these results are invalid, the conclusions should state so <br />directly. If a new sample must be collected and analyzed, that <br />too should be stated in the conclusions. <br />3. Table 3 should include a footnote under well M-9 stating that <br />analysis of total cyanide exceeding the holding time by 2 days, in <br />keeping with the notes compiled for other out-of-spec analyses. <br />
The URL can be used to link to this page
Your browser does not support the video tag.