My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP08773
DRMS
>
Back File Migration
>
Report
>
REP08773
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:38:34 PM
Creation date
11/26/2007 11:58:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977211
IBM Index Class Name
Report
Doc Date
5/26/1994
Doc Name
SUBMITTAL OF SIX ANNUAL REPORTS FOR CASTLE CONCRETE CO
From
MARK A HEIFNER
To
DMG
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.~ ;« <br />'. <br />• Notice of Intent to Continue Mining Operations ~E~ EI-%~ h <br />112 Annual Report mA Y 2 <br />6 1994 <br />Permittee Name: Castle Concrete Company <br />Permi t No: M-77-211 ~i'~°io~nc: ~;in~• ~~. <br />Operation Name: Pikeview Quarry ~~`~~~:.r:coi <br />Anniversary Date: 05/27/94 <br />Total: $550.00 (Due on your Anniversary Date) <br />1. Has this mine been granted TEMPORARY CESSATION STATUS? YES NO <br />Does this mine operate MORE or LESS than 180 days per year? MORE LESS <br />2a. Financial Warranty: $ 220,217 2b. Permitted acreage: 193 <br />3. Does this mine have a phased reclamation plan? ES NO <br />4. Total acres affected during the report year:* 65-70 <br />5. Total acres reclaimed for the report year:* 1 <br />6. Total acres in various stages of reclamation:* <br />a. Backfilled: 5 d. Topsoil replaced: 4 <br />b. Graded: 13 Average topsoil thickness <br />c. Seeded: 13 replaced: 10" <br />List species seeded & seeding <br />rate for report year on back <br />7. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* none <br />8. Estimated total acres to be affected in the next report year:* 70-75 <br />9. COMMENTS: SEE ADDITIONAL SHEET. <br />* Please show the location of the acreage for items <br />Indicate the phases of the reclamation which have been <br />your Ttimetable. <br />** NOTE: If there have not been any changes since the <br />previously submitted a map which correctly depicts the <br />through 6, then a new map is unnecessary. However, yo <br />4 - 6 on your map**. <br />completed, correlated with <br />last annual report and you <br />current acreage in items 2 <br />~ must state this fact above <br />Signature: ~~ 4iL~ ~G Date: 5-26-'94 <br />Please type or print current contact name, mailing address, and phone number below: <br />Contact Name: <br />Company: <br />Address: <br />Rick Paraday ~ Phone: (719 ) 598-0215 <br />Castle Concrete <br />Box 2379 <br />Colorado Springs, CO 80901 <br />Federal Tax ID No. or Social Security No. <br />
The URL can be used to link to this page
Your browser does not support the video tag.