My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP08412
DRMS
>
Back File Migration
>
Report
>
REP08412
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:38:18 PM
Creation date
11/26/2007 11:53:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
3/22/1993
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112 ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />BATTLE MOUNTAIN GOLD COMPANY <br />March 16, 1993 <br />Mr. Larry Oehler ~ ~`~ <br />Division of Minerals and Geology 9NiLE MOUNWN <br />1313 Sherman Street, Room 215 GOID COMWJJV <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources, Inc. (BMRI) - San Luigi; <br />DMG Permit No. M-88-112 <br />1992 Annual Report <br />Dear Mr. Oehler: <br />The following is a summary of activities at BMRI's Sar. Luis <br />Project during 1992. <br />1992 Technical Revisions <br />The following is a brief summary of technical revisions <br />initiated during 1992. <br />TR-004 Cytox Detoxification <br />On April 7, the use of Cytox was approved as an emergency <br />cyanide detoxification method. <br />TR-005 Extended Cytox Detoxification <br />On May 1, the continued use of Cytox as an interim cyanide <br />detoxification method was approved. The approval stif~ulated <br />that evaluation of long-term detoxification methods m>v.st <br />continue. <br />TR-006 pA/OC Water Sampling Protocol Manual <br />On October 15, the water sampling manual was approved. <br />On June 12, the use of hydrogen peroxide as an interim <br />cyanide detoxification method was approved. Hydrogen <br />peroxide treatment was started on June 15. <br />TR-008 Ground Water Monitoring Plan <br />Two additional ground water monitoring wells, M-12 anc. M-13, <br />were installed in July. DMG continues to review TR-0C8. <br />TR-009 Surface and Ground Water Containment Plan <br />on November 24, the surface and ground water containmE~nt <br />plan was approved contingent upon the approval of TR-COB. <br />P.O. BOX 310 SAN LUIS, COLORADO 81152-0310 (719) 672-3362 FAX (719) 672-3363 <br />
The URL can be used to link to this page
Your browser does not support the video tag.