Laserfiche WebLink
1 <br />I~ <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />NCEC - 1989 HYDROLOGY REPORT <br />3.0 PROJECT 9yATER BALANCE <br />3.1 Vulcaa Ditch <br />Flow in the Vulcan Ditch began in April, 1989 and continued through <br />October, 1989. Since the mine operation was suspended throughout <br />1989, all water diverted by the Vulcan Ditch was used exclusively <br />for agricultural purposes. Diversions to the ditch were as listed <br />below: <br />April - October, 1989: 1,330.96 Ac-Ft <br />Total: 1,330.96 Ac-Ft <br />3.2 Agricultural IIses <br />As stated above, all diversions from the Vulcan Ditch during 1989 <br />were for agricultural purposes. <br />3.3 Mine IIses <br />The Coal Ridge Number 1 Mine did not use any water during 1989 <br />since operations were in temporary suspension. No discharges were <br />made by the mine during this time period. <br />Adrian Bro~+n Consultants -5- Ref:1145/900131MG.HYD <br />