Laserfiche WebLink
<br /> <br />were applied. Careful soil sampling will be performed prior <br />to seeding this next year. <br />Rule 2.41(6): Because no reclamation as such was perfomed <br />there is nothing to appraise except the small amount done in <br />various stages. With regard to those areas, everything <br />looks quite good with few problems and those are rather <br />easily solved. <br />Rule 2.41(7): The areas to be affected in the coming year <br />will be very nearly the same as those affected during the <br />last year. The pit cycle will probably enter Cycle Step 1 <br />(movement of the processing plant) and Cycle Step 2 (perimeter <br />mining). <br />In reclamation, the berm will hopefully be ready to <br />seed in April, 1982, as well as some bench areas. Some <br />additional bench areas may also be ready for seeding by <br />April, 1982, but more likely they will simply be graded and <br />allowed to settle until April, 1983. <br />General Appraisal of Permit Compliance - In the opinion of <br />Castle Concrete Company, the Snyder Quarry operation is in <br />general compliance with the permit. The mining and bench <br />reclamation seem to be somewhat ahead of schedule, but the <br />berm is somewhat behind schedule. <br />Rule 2.42: The annual report fee of Three Hundred Fifty ($350.00) <br />Dollars is tendered herewith. <br />Page 4 of 4 (CAS 81/7) <br />