My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP07025
DRMS
>
Back File Migration
>
Report
>
REP07025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:37:19 PM
Creation date
11/26/2007 11:31:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Report
Doc Date
3/7/1985
Doc Name
1984 ANNUAL REPORT HENDERSON MINING PN 77-342
From
CLIMAX MOLYBDENUM CO
To
MLRB
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reclamation Costs <br />iHenderson Mine • . <br />•~ February 1985 <br />Page 5 <br />14. Powerline/Refuse Area (17 acres) <br />a) Dismantle, break even $ 0 <br />b) Grading & site preparation 2' 1. <br />c) Reveg. road bed, 3 acres @ <br />$1,045/acre 3 <br />d) Fert. slopes, 14 acres, <br />1 application 0 <br />Total $ 5 <br />15. Makeup Water Line/Pumphouse (8 acres) <br />a) Dismantle, break even $ 0 ~ <br />b) Grading & site preparation 2' <br />c) Reveg. pumphouse, 1 acre @ <br />$1,045/acre 1 <br />d) Fert. 7 acres, 1 application 0 <br />Total S 3 <br />16. Tailing Line/Powerline (47 acres) <br />a) Dismantle $ 2 ~ <br />b) Grading & site preparation 2~ <br />c) Reveg. 5 acres @ $1,045/acre 5 <br />d) Fert. slopes, 27 acres, <br />1 application 1 <br />e) Buffer, 15 acres 0 <br />Total $ 10 <br />17. E. Branch Flood Bypass (5 acres) <br />a) Fe rt. 5 acres, 1 application $ 0 <br /> Total $ 0 <br />18. Tailing Buil ding/Road (45 acres) <br />a) Reveg. 6 acres @ $1,045/acre $ 6 ,l <br />b) Grading & site preparation 2 i <br />c) Buffer, 39 acres 0 <br /> Total $ 8 <br />19. Mill Water Return Line/Powerline (31 acres) <br />a) Reveg. road, 8 acres @ $1,045/acre $ 8 ~ <br />b) Grading & site preparation 2- <br />c) Fe rt. slopes, 16 acres, <br />1 application 1 <br />d) Buffer, 7 acres 0 <br />Total $ 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.