Laserfiche WebLink
Reclamation Costs <br />''Henderson Mine • <br />February 1985 <br />Page 4 <br />6. East Branch Reservoir Shores (100 acres) <br />a) Dismantle, break even <br />b) Reveg. 4 acres @ $1,045/acre <br />c) Fert. shores, 41 acres, <br />1 application <br />d) Buffer, 55 acres <br />Total <br />7. Horseshoe Intake Shores (2 acres) <br />a) Fe rt. 2 acres, 1 application <br />Total <br />8. Ute Creek Reservoir Shores (12 acres) <br />a) Fe rt. 12 acres, 1 application <br />Total <br />9. Tailing Deposition Area (2,446 acres) <br />a) Reveg. tailing, 715 acres @ <br />$4,068/acre <br />b) Flood control <br />c) Reveg. peri. road, 94 acres @ <br />$700/acre <br />d) Perm. use, bypass canal/road, <br />40 acres <br />e) Buffer, 1,597 acres <br />Total <br />10. Gravel Pit & Storage (54 acres) <br />a) Reveg. 35 acres @ $1,045/acre <br />b) Grading & site preparation <br />c) Buffer, 19 acres <br />Total <br />11. RR Gravel Pit (5 acres) <br />a) Grading & site preparation <br />b) Reveg. 5 acres @ $1,045/acre <br />Total <br />12. Contractors' Camp & Storage (9 acres) <br />a) Fert. 9 acres, 1 appl. <br />Total <br />13. Borrow Area (4 acres) <br />a) Reveg. 3 acres @ $1,045/acre <br />b) Fert. 1 acre, 1 application <br />Total <br />u <br />$ 0 <br />4 <br />1 <br />0 <br />$ 5 <br />$ 0 <br />$ 0 <br />$ 0 <br />S 0 <br />$2,909 ~ <br />200' Z <br />~•~pa . <br />6 6 w ~`~ <br />0 <br />0 <br />$3,175 <br />$ 37 ~ <br />10~ <br />0 <br />S 47 <br />1~ <br />$ 5 <br />$ 6 <br />$ ~ ~ <br />$ 0 <br />$ 3 <br />0 <br />$ 3 <br />