My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP07025
DRMS
>
Back File Migration
>
Report
>
REP07025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:37:19 PM
Creation date
11/26/2007 11:31:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Report
Doc Date
3/7/1985
Doc Name
1984 ANNUAL REPORT HENDERSON MINING PN 77-342
From
CLIMAX MOLYBDENUM CO
To
MLRB
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reclamation Costs <br />Henderson Mine ~ • <br />February 1985 <br />Page 2 <br />2. Cost per acre of areas with a subsoil growth medium such as <br />the portal area, reservoir shores, powerlines, etc.: <br /> Man-Days Labor Material 'COtal <br />Scarification or ripping .1 $ 100 $ -0- S 100 <br />300 trees 3 312 150 462 <br />40 shrubs 2 208 26 234 <br />Seed .2 21 94 115 <br />Fertilizer .2 21 14 35 <br />Maintenance fert.,3 appl. .6 63 36 99 <br />Total $.L,045/acre <br />3. Cost for revegetating 1 acre of tailing: <br />Revegetate @ $1,045 from Item ~ above) $ 1,045 <br />Topsoiling, $1.75/yd 1,613 yd 2,823 <br />Liming, $200 ($100 Mat., $100 labor) _ 200 <br />Total $ 4,068/acre <br />4. Cost per acre for maintenance fertilization: <br />Man-Days Labor Material Total <br />.2 $ 21 $ 12 S 33/acre <br />
The URL can be used to link to this page
Your browser does not support the video tag.