Laserfiche WebLink
~~f~ III IIIIIIIIIIIIIiII <br />999 <br />Blue Mountain Energy <br />Deserado Mine <br />P.O. Box 1067 <br />Rangely, CO 81648 <br />,~~~~o <br />1g <br />1/6/97 Ga a,J~ ~~ha~ <br />Mr. Dan Mathews <br />Division of Minerals and Geology <br />2148 Broadway, #C-5 <br />Grand Junction, Colorado 81503 <br />Re: Professional Certification document for the Coal Processing Waste Bank on Deserado Mine <br />Property, Bonanza Power Project <br />File No. C-018-81 <br />Dear Mr. Mathews: <br />During the fourth quarter of 1996, myself and qualified persons working under my direction <br />conducted a series of compliance inspections on the active coal processing waste banks located <br />within the Deserado permit area. These inspections were conducted roughly on a bi-weekly basis. <br />I am a professional engineer registered in the State of Colorado and my experience fulfills the <br />requirements of the Colorado Surface Coal Mining Reclamation Act. <br />The purpose of these inspections and subsequent certification is to ensure proper construction of the <br />refuse piles and to satisfy the requirements of Rule 4.10.2 of [he Colorado Mined Land Reclamation <br />Board. <br />INSPECTION OF ACTIVE AREAS 2-3 .4 and 5a <br />There are no apparent points of seepage, or indications of slope failure on the active piles. <br />The surface drainage facilities were adequately maintained and were working properly. Minor rilling <br />in the 100 yr. ditches was repaired on a continuing basis. <br />