My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP06635
DRMS
>
Back File Migration
>
Report
>
REP06635
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:37:04 PM
Creation date
11/26/2007 11:24:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Report
Doc Date
1/1/1995
Doc Name
1994 TABLE OF CONTENTS ANNUAL RECLAMATION REPORT
Permit Index Doc Type
ANNUAL RECLAMATION REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
thickness and determining final graded spoil quality. Exhibit 94.3 <br />• through 94.5 shows the location of the sample sites along with the <br /> thickness of soil replacement. <br />moil Ouality <br />The spoil sampling and analysis program approved for New Horizon <br />Mine is described in Tab 21 of Permit C-81-008. Spoil samples were <br />collected from 19 sites in the New Horizon 2 area.. Samples were <br />collected from the sidewalls of four foot deep pit, excavated with <br />a rubber tired backhoe. All spoil samples were shipped to Colorado <br />State University Soil Testing Lab in Fort Collins, Colorado for <br />analysis. <br />The location of each spoil pit is shown on Exhibit 94.5, Backfill <br />• Spoil Sampling Location Map. Laboratory results for the 19 spoil <br />samples are presented in Attachment 94.1. the analytical results <br />indicate all spoil is suitable. No additional grading, special <br />handling, or amendment application was needed prior to soil <br />replacement. <br />15,000 cubic yards of Lift 2 topsoil was used from an existing <br />stockpile to start the topsoil redistribution process. The <br />remaining volume of topsoil that was used for redistribution was <br />live handled from ahead of the active mining area to the awaiting <br />backfill area. <br />,• 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.