<br />ANNUAL REPORT
<br />INSTRUCTIONS
<br />
<br />According to C.R.S. 34-3'_-1 16(3), and C.R.S. 34-32.5-I 16(3)(a), on the anniversary date of the permit each year,
<br />the operator shall submit a report and a map showing the extent of current disturbances to affzcted land.
<br />~;.
<br />recla[t~ap~ tpcco~Jlis(Pe"d to date and during the preceding year, new disturbances [hat are anticipated to occur
<br />du~~ng~~ the p~ot~}tq~;.~cu;tta~n~,d reclamation that will be pzrformed during the upcoming year. Please attach such
<br />a re,~o~~t t' a~~losiltlktnnual report form. (.4n adequately labeled map that clearly delineates and includes
<br />the a ove e ements may suffice for a written report.)
<br />If your operation is subject to the provisions of Temporary Czssation as defined in the Act and Rules, you must
<br />provide with the Annual Repott the following information as required by '_ CCR 407-1, =107-4, and Rules
<br />1.13.7(1)(a):
<br />(i) the condition of the operation a[ the time of cessation:
<br />(ii) what specific measures have bzen and will be implemented Co comply with reclamation, performance
<br />standards and Environmental Protection Plan requirements, if they are part of your approved application: and
<br />(iii) plans for resumption of mining operations-.
<br />Please provide the additional following information with your Annual Report, as applicable:
<br />(a) Per the requirements of 2 CCR 407-I. 407-4, and Rules 1.15(1), provide an updated statement
<br />regarding the sufficiency of the value of [he Financial Warranty, specifically:
<br />(i) Per the requirements of 2 CCR 407-I, 407-4, and Rules 1.15(I)(a), provide an updated
<br />statement regarding the sufficiency of [he value of [he financial warranty. Specifically,
<br />irrevocable letters of credit, Deeds of Ttvst, and security agreements, self-insurance, salvage
<br />credit, and first priority liens on project related fixtures.
<br />(ii) Per the requirements of 2 CCR 407-], 407-4, and Rules 1.15(I)(b), permits secured with a
<br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified
<br />independent appraiser, indicating any changes in property value, and a statement summarizing
<br />any circumstances which may affect [he adequacy of [he Deed of Trust, or Security agreement,
<br />=~ - and ahe value of the property subject.to either of thv.,e ins[raments. The report shall also_provide.
<br />proof that [here are no pas[-due property taxes.
<br />(i) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.7(3), permits secured with an
<br />Irrevocable Letter of Credit, the operator shall have the bank provide documentation in [he form
<br />of a balance sheet, certified by a Certified Public Accountant, demonstrating [hat the Letter of
<br />Credit does not exceed ten percent (10%) of the bank's capital surplus accounts.
<br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.9.3(c), permits secured by a First
<br />Priority Lien on any fixtures and Equipment, Che operator shall provide a report in sufficient
<br />detail to fully describe the condition, value, and location of all pledged fixmres and equipment.
<br />(b) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(c), all monitoring information
<br />required as part of thz approved permit application, to include the Environmental Protection Plan. (Please
<br />note that if you are not a Designatzd Mining Operation, you will not have an Environmental Protection
<br />Plan as part of your approved permit.)
<br />
<br />
|