Laserfiche WebLink
<br />' Block 4 contains live-handled roto-cleared topsoil (1993) and was not seeded to further the trial <br />area started with Block 1. <br />' • 1995 - At midpoint of Block, a portion was interseeded and livestock imprinted. <br />• 1996 -Gully repair and seeding on lower slopes at midpoint of block where previous <br />livestock imprinting efforts where considered insufficient. <br />Block 5 contains live-handled roto-cleared topsoil (1993) that was seeded in the spring of 1994. <br />• 1995 -Gullies repaired in conjunction with construction of Downdrain 1. <br />• 2001 -Gully repair and seeding south of Moffat Downdrain 2. <br />• 2004 -Gully repair along lower and upper reaches of Downdrain 2 and east of Lower Moffat <br />Road. <br />Block 6 contains live-handled roto-cleared topsoil (1993) that was seeded in the spring of 1994. <br />• 1996 -Gully repaired and reseeded on lower slope. <br />• 1997 -Gullies caused by runoff from Lower Moffat Road narrowing activities repaired and <br />reseeded on upper slope. <br />• 2001 -Gully repair and seeding south of Moffat Downdrain 1. <br />• 2002 -Gully repair and seeding on north facing slope. <br />Block 7 contains live-handled roto-cleared topsoil (1994) that was not seeded as part of the test <br />practice employed in Blocks 1 and 4. <br />• 1995 -Gully repaired and reseeded on lower slope. <br />Block 8 contains live-handled roto-cleared topsoil (1994) and was seeded in (1995). <br />• 1997 -Gully repaired and reseeded on lower slope south of Downdrain 4. <br />Block 9 contains live-handled roto-cleared topsoil (1994) and was seeded in 1995. <br />' • 1996 -Gullies along the lower slope repaired and reseeded. <br />• 1997 -Gullies caused by runoff from Lower Moffat Road narrowing activities repaired and <br />reseeded on upper slope. <br />Block 10 contains stockpiled topsoil (1996) and was seeded in 1996. This block was also <br />contour furrowed. <br />• 1997 -Several gullies were repaired and reseeded at various locations in this block. Areas <br />included: the northwestern most edge; the central upper and lower portion of the block where <br />gully drainage entered into the Moffat final pit drainage channel; along Downdrain 4 where a <br />system of gullies occurred; along the western edge of the reclaimed Middle Moffat Haul road <br />in the vicinity of Downdrain 2 and; along the western edge of the reclaimed shoulder of the <br />narrowed Lower Moffat Road. <br />1998 -Gullies along hillslope which drain into the final pit drainage repaired and reseeded. <br />• 1999 -Repaired sections of the Final Pit Downdrain and Downdrain 4; roughed-up and <br />seeded the new gully activity associated with the pit Downdrain; repaired gullies and <br />installed contour furrows north of Final Pit Downdrain. <br />