Laserfiche WebLink
Bowie Resources Limited <br />Bowie No. 1 Mine <br />2004 Mnual Hydrology Report <br />607 <br />Borehole 7 <br />Depth - 95.3' <br />Elevation - 6602' <br />Initiated 9/1/81 9/1/81 <br />Activated 9/1!61 9NI81 <br />Date 12/21/04 6/29/04 <br />• <br />I <br />(NITS <br />Summary InfonnaGon <br />Baseline Opeation <br />Min Ave Max Min Ave Max <br />StaOc Water Level Feet 69.40 85.62 94.84 94.77 94.84 <br />Water Elevation Feet 6507 6516 6533 6507.23 6507.16 <br />Temperature Celsius 7.0 13.5 79.6 12.8 16.4 <br />Conductivity umhos/cm 152 7323 2190 1700 1520 <br />pH su 5.8 7.5 8.9 7.4 7.3 <br />Field Comments <br />"'Not Enough Water for Lab Paremeters <br />Borehole &7, also referred to as Node 22, is boated below sedimentation pond #4 and is periodically monitored for <br />water quality to ascertain potential groundwater contamination attributable to the East Mine /adlities area. <br />There is no baseline wllection possible tar points initiated after the inauence of mining. <br />Ground Water <br />Figure ND. 8 <br />fie area o/ concern for morritodng point B07 was a/leded by the mining operation be/ore Hs establishment. There/ore, <br />all recorded monitodng events are considered Operational. <br />