Laserfiche WebLink
Bowie Resources Limited <br />Bowie No.1 Mine <br />2004 Annual Hydrology Report <br />BO6 <br />Borehole 6 <br />Depth - 93.8' <br />Elevation - 6780.5' <br />IniBated 9/1/81 9l1 /81 <br />Activated 9/1/81 9/1/Si <br />Date 12/21/04 6I30I04 <br />UNITS <br />Summary Information <br />Baseline OperaBon <br />Min Ave Max Min Ave Max <br />Static Water Level Feel 83.68 93.81 94.03 93.88 93.68 <br />Water Elevation Feet 6686.5 6686.7 6686.8 6686.62 6686.82 <br />Tempe2ture Celsius <br />Conductivity umhos/an <br />pH su <br />Field Comments D Dry <br />Ground Water <br />CJ <br />_J <br />Borehole B-6 is /orated upsfope of the redaimed waste dispose! pile and is monitored for inleAace seepage <br />in connedion with slope and waste pile stability. Borehole 8-6 is dry. <br />• <br />There is ro baseline collection possible for points initialed Aker the influence of mining. <br />Figure No. 7 <br />The area of conosm far monitoring point 806 was alfeded by the mining operation before Rs establishment Therefore, <br />all recorded monitoring events are considered Operational. <br />