My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP04982
DRMS
>
Back File Migration
>
Report
>
REP04982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:36:03 PM
Creation date
11/26/2007 10:57:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Report
Doc Date
4/25/2000
Doc Name
4th Qtr 1999 Inspection
From
GREAT DIVIDE ENGINEERING & SURVEYING
To
ENERGY FUELS COAL INC
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1' <br />The entire pile was checked for any springs or seeps and none found, very little <br />standing water was observed. Lift thickness, material consistencies and placement <br />procedures appear to be in compliance with Terra Matrix re-evaluated stability analysis. <br />Minor erosion channels were observed in several slopes on the active pile and <br />evidence of hay bales installed to check erosion on the steep slopes of the reclaimed pile <br />appear to have functioned well. The erosion cltamtel along the north face of the reclaimed <br />pile that had been noted and flagged with orange flagging at the previous inspections teas <br />not yet been repaired; recommend installation of hay bale to eliminate further erosion <br />Vegetation on the reclaimed face appeared to be in good condition, but dormant. <br />The very iop of the active pile is being covered with soil in anticipation of being reclaimed <br />as well as a section on the northwesterly slope; the area westerly of the existing pile has <br />been expanded and the alternate fines and course material have begun to increase the size <br />of the pile considerably. <br />Information provided by EFCI estimated that 30,932 tons of refuse material has <br />been placed on two and a half acres in the "newer" southwest section of the pile. <br />A summary of my comments and recommendations for ttris quarterly inspection <br />include continuous monitoring of lift thickness and materials consistency and any erosion <br />damage, monitoring and recording of seeps and provide an updated estimate ofthe rate of <br />material deposition <br />To the best of my knowledge, based upon my professional expertise, the <br />permanent coal refuse stockpile at the SouthSeld Mine is being constructed in <br />conformance with the prudent state-of--the-art of earthen embankment construction <br />I hereby certify, based upon my field observations and professional investigations, <br />as detailed here above, that the permanent coal refuse stockpile at Energy Fuel Coal, <br />Incorporated's SouthSeld Mine, located in Fremont County, Colorado, ;s being <br />constructed and maintained in compliance with the approved refuse disposal plan of the <br />Cobrado Mined Land Reclamation Division <br />.._... ~ i <br />,i <br />`,.`,/, <br />4 ~" <br />
The URL can be used to link to this page
Your browser does not support the video tag.