Laserfiche WebLink
] 2.05.6(3) <br />Water Monitoring Plan <br />(iv) The following monitoring plan is dcsigned to provide data which will verify that the <br />operation will not have a significant adverse impact on the surface or subsurface water which is within or <br />adjao¢at to the permit area. The sample points, which are shown on the Hydrologic Area Map, Drawing No. <br />110, are as follows: <br />Monitoring Station <br />B-1 Upper Bramiers Draw <br />B-2 Lower Brarniers Draw <br />N-lA Upper Naturita Creek <br />N-2 Lower Naturita Creek <br />H-2 Lower Broad Creek <br />S-1 Soction 33 Creek <br />Monitoring Schedule <br />1&5 <br />1&5 <br />2&4 <br />2&4 <br />1&5 <br />l&5 <br />SP-1 Long Draw Spring <br />SP-2 Section 33 Spring <br />SP-3 Homestead Spring <br />SP-4 Bramiers Draw Spring <br />SP-5 East Homstead Spring <br />SP-6 B & W Spring No. 1 <br />AW-3 Alluvial Well -Section 33 <br />l BW-1 Bedrock Well -Section 3 <br />BW-2 Bedrock Well -Section 33 <br />BW-3 Bedrock We11-Section 11 <br />AW-4 Alluvial Well - Bramiers Draw <br />AW-5 Alluvial We11- Bramiers Draw <br />AW-6 Alluvial Well - Naturita Crcek <br />AW-7 Alluvial Well - Naturita Creek <br />R-1 Rced Chatfield Ditch <br />Monitoring Notes: <br />6 <br />6 <br />6 <br />6 <br />6 <br />6 <br />Discontinue <br />7 <br />7 <br />7 <br />2&3 <br />2&3 <br />2&3 <br />2&3 <br />2&4 <br />Field Parameters <br />1. Field parameters quarterly. pH <br />2. Field parameters semi-annually. Conductivity <br />3. Amual fall full suite Gst 1. Temperature <br />4. Annual fall full suite list 2. Flow or Water Level <br />5. Annual full suite list 2 - 5rst opportunity. <br />6. Spring & Seep survey in April or May -record field parameters for springs with measurable flow -full <br />suite required for springs with flow over S gpm - 5eld parameters on springs that had >5 gpm flow in the <br />fall. <br />7. Depth to water semi-annually. <br />List 1 and Gst 2 are contained in Exhibit 3. <br />2.05-35 September 1995 <br />