Laserfiche WebLink
2.05.6(3) <br />Water Monitoru>g_Plan <br />(iv) The following monitoring plan is designed to provide data which will verify that the <br />operation will not have a significant adverse impact on the surface or subsurface water which is within or <br />adjacent to the permit area. The sample points, which are shown on the Hydrologic Area Map, Drawing No. <br />110, are as fouows: <br /> Monitoring Station Monitoring Schedule <br /> B-1 Upper Bramiers Draw 1 & 5 <br /> B-2 Lower Bramiers Draw I & 5 <br /> N-lA Upper Naturita Creek 2 & 4 <br /> N-2 Lower Naturita Creek 21k 4 <br /> H-2 Lower Broad Creek 1 & 5 <br />- S-1 Section 33 Creek 1 & 5 <br />- SP-1 Long Draw Spring 6 <br /> SP-2 Section 33 Spring 6 <br />' SP-3 Homestead Spring 6 <br /> SPA Bramiers Draw Spring 6 <br /> SP-5 East Homstead Spring 6 <br />' SPA B & W Spring No. I 6 <br /> AW-3 Alluvial Well -Section 33 Discontinue <br />' BW-1 Bedrock Well -Section 3 7 <br /> BW-2 Bedrock Well -Section 33 7 <br /> BW-3 Bedrock Well -Section 11 7 <br />' AW-4 Alluvial Well - Bramiers Draw 2 & 3 <br /> AW-5 Alluvial Well - Bramiers Draw 2 & 3 <br /> AW-6 Alluvial Well - Naturita Creek 2 & 3 <br />' AW-7 Alluvial Well - Naturita Creek 2 & 3 <br /> R-I Reed Chatfield Ditch 2 & 4 <br />' Monitoring Notes: Field Parameters <br /> 1. Field parameters quarterly. pH <br />' 2. Field parameters semi-annually. Conductivity <br /> 3. Annual fall full suite Gst 1. Temperature <br /> 4. Annual fall fial suite fist 2. Flow or Water Level <br /> 5. Annual fiill suite list 2 - 5rst opportunity. <br /> 6. Spring .@ Seep survey in April or May -record field parameters for springs with measurable flow -full <br /> suite required for springs with flow over S gpm -field parameters on springs that bad >5 gpm flow in Ute <br /> ~. <br /> 7. Depth to water semi-annually. <br />' List 1 and Gst 2 are contained in Exhibit 3. <br /> 2.05-35 September 1995 <br /> <br />1 <br />