My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP04041
DRMS
>
Back File Migration
>
Report
>
REP04041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:35:06 PM
Creation date
11/26/2007 10:41:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977245
IBM Index Class Name
Report
Doc Date
2/8/1991
Doc Name
ANNUAL REPORT FOR JEFFERSON CNTY IN THE MATTER OF PERMIT M-77-245 PINE JUNCTION QUARRY
From
GAMBIT INC
To
MLRD
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION PENDING COMPLETION OF MINE PHASE M2 <br />AND M3 IN 1999 AND DISPOSITION OF A PLANNED <br />VISUAL HERM. DISPOSITION OF THE VISUAL BERM <br />WILL BE DETAILED IN A FORTHCOMING TECHNICAL <br />REVISION. <br />ABSTRACT OF ACTIVITY <br />SPECIAL NOTE: REFER TO THE INCLUDED MAP FOR MINING AND <br />RECLAMATION PHASE LOCATIONS AND APPROXIMATE <br />LOCATIONS OF FIXED PHOTO-REFERENCE POINTS. <br />CURRENT DISTURBANCES: EXCAVATION REMAINS IN MINE PHASE M1 TO THE <br />EXTENT SHOWN. <br />PREVIOUS YEAR: EXCAVATION WAS LIMITED TO MINE PHASE M1, AS <br />APPROXIMATED IN THE INCLUDED MAP. A NEW ACCESS <br />ROAD WAS ALSO CONSTRUCTED. THE APPROXIMATE <br />LOCATION OF THE ROAD IS SHOWN IN THE INCLUDED <br />MAP. ADDITIONALLY, SPECIFIC DESIGN FEATURES <br />AND INTENT OF THIS ACCESS ROAD WILL BE DETAILED <br />IN A FORTHCOMING TECHNICAL REVISION. THE <br />TECHNICAL REVISION WILL ALSO DEFINE DETAILS OF <br />OTHER ACTIVITIES AND DISTURBANCES INFLUENCING <br />OPERATIONS AT THIS SITE. <br />FUTURE DISTURBANCES: EXTRACTION WILL CONTINUE IN MINE PHASE M1 <br />THROUGH 1991 TO THE EXTENT APPROXIMATED IN THE <br />INCLUDED MAP. NO OTHER DISTURBANCES ARE <br />ANTICIPATED AT THIS TIME. <br />FUTURE RECLAMATION: RECLAMATION PHASE R1 IS NOT ANTICIPATED UNTIL <br />COMPLETION OF MINE PHASE M2 AND M3 IN 1999. <br />RECLAMATION PHASE R1 IS PENDING DISPOSITION OF <br />A POSSIBLE REDESIGN OF THE PROPOSED VISUAL <br />BERM. VISUAL BERM CONSTRUCTION WAS DELAYED BY <br />PREVIOUSLY PLACED DEPOSIT STOCKPILES, WHICH <br />HAVE SINCE BEEN DEPLETED. THIS CONCERN WILL BE <br />RECONCILED IN A FORTHCOMING TECHNICAL REVISION. <br />NARRATIVE REPORT <br />I G: <br />Excavation will continue within Mine Phase M1 through 1991. <br />Excavation was limited to Mine Phase M1 through 1990. The <br />extent for principal extraction activity each year is approx- <br />imated in the included map. <br />Mine Phase M2 and M3 will be combined in a forthcoming <br />Technical Revision and the Direction of Mining will be <br />1/31/91 Annuel Report to the Colorado Mined Land Reclamation Division 2 <br />Jefferson County Colorado, Permit M-77-245, Pine Junction Quarry. <br />
The URL can be used to link to this page
Your browser does not support the video tag.