Laserfiche WebLink
1 <br />1 <br />1 <br /> <br /> <br />3.2 DEMOLITION AND REMOVAL <br />A. The Subcontractor shall be responsible for determining the extent of demolition and <br />removal work required by inspecting the site before commencing ANY work. <br />B. Demolished items shall be broken or cut such that the largest dimension of any debris <br />is no larger than 8 feet. All debris resulting from demolition and/or removal shall be <br />hauled to an approved landfill. <br />3.3 BACKFILLING <br />A. The Subcontractor shall backfill all demolition areas to existing ground level or as <br />directed by the RESIDENT PROJECT REPRESENTATIVE in accordance with the <br />compaction requirements of Section 02200. <br />PART 4 PAYMENT <br />4.1 GF.NARAT. <br />A. Payment for work in this section will be included as part of the unit price stated in the <br />Schedule of Contract Prices. <br />END OF SECTION 02065 <br />6-4 <br />