My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP03942
DRMS
>
Back File Migration
>
Report
>
REP03942
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:34:53 PM
Creation date
11/26/2007 10:40:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977424
IBM Index Class Name
Report
Doc Date
8/14/1995
From
DAMES & MOORE
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 <br />1 <br /> <br /> <br />3.2 DEMOLITION AND REMOVAL <br />A. The Subcontractor shall be responsible for determining the extent of demolition and <br />removal work required by inspecting the site before commencing ANY work. <br />B. Demolished items shall be broken or cut such that the largest dimension of any debris <br />is no larger than 8 feet. All debris resulting from demolition and/or removal shall be <br />hauled to an approved landfill. <br />3.3 BACKFILLING <br />A. The Subcontractor shall backfill all demolition areas to existing ground level or as <br />directed by the RESIDENT PROJECT REPRESENTATIVE in accordance with the <br />compaction requirements of Section 02200. <br />PART 4 PAYMENT <br />4.1 GF.NARAT. <br />A. Payment for work in this section will be included as part of the unit price stated in the <br />Schedule of Contract Prices. <br />END OF SECTION 02065 <br />6-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.