! • • <br />SC-10.0 KEY PERSONNEL COMMITMENTS <br />' SUBCONTRACTOR agrees to commit the key personnel listed in Section P.1 of the bid for the <br />duration of the WORK. Substitution of key personnel must be approved by the <br />CONTRACTOR. Substitution without the approval of the CONTRACTOR will be cause for <br />' termination under the provisions of GC-32.0 "TERNIINATION FOR DEFAULT." <br />SC-11.0 PHYSICAL CONDTITONS -UNDERGROUND FACII.ITIES <br />11.1 Shown or Indicated: The information and data shown or indicated in the CONTRACT <br />DOCUMENTS with respect to existing Underground Facilities at or contiguous to the <br />site is based on information and data furnished to COMPANY or CONTRACTOR by <br />the owners of such Underground Facilities or by others. Unless it is otherwise <br />1 expressly provided in the Supplementary Conditions: <br />11.1.1 COMPANY and CONTRACTOR shall not be responsible for the accuracy or <br />completeness of any such information or data; and, <br />11.1.2 SUBCONTRACTOR shall have full responsibility for reviewing and checking <br />all such information and data, for locating all Underground Facilities shown <br />or indicated in the CONTRACT DOCUMENTS, for coordination of the <br />WORK with the owners of such Underground Facilities during construction, <br />' for the safety and protection thereof and repairing any damage thereto resulting <br />from the WORK, the cost of all of which will be considered as having bcen <br />included in the CONTRACT Price. <br />11.2 Not Shown or Indicated: If an Underground Facility is uncovered or revealed at or <br />contiguous to the site which was not shown or indicated in the CONTRACT <br />' DOCUMENTS and which SUBCONTRACTOR could not reasonably have been <br />expected to be aware of, SUBCONTRACTOR shall, promptly after becoming aware <br />thereof and before performing any WORK affected thereby (except in an emergency), <br />identify the owner of such Underground Facility and give written notice thereof to that <br />owner and to COMPANY and CONTRACTOR. COMPANY will promptly review the <br />Underground Facility to determine the extent to which the CONTRACT DOCUMENTS <br />1 should be modified to reflect and document the consequences of the existence of the <br />Underground Facility, and the CONTRACT DOCUMENTS will be amended or <br />supplemented to the extent necessary. During such time, SUBCONTRACTOR shall be <br />responsible for the safety and protection of such Underground Facility. <br />SUBCONTRACTOR shall be allowed an increase in the CONTRACT Price or an <br />extension of the CONTRACT Time, or both, to the extent that they aze attributable to <br />the existence of any Underground Facility that was not shown or indicated in the <br />CONTRACT DOCUMENTS and which SUBCONTRACTOR could not reasonably have <br />been expected to be awaze of. If the parties are unable to agree as to the amount or <br />length thereof, SUBCONTRACTOR May make a claim therefor as provided. <br />4-6 <br />