My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP03942
DRMS
>
Back File Migration
>
Report
>
REP03942
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:34:53 PM
Creation date
11/26/2007 10:40:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977424
IBM Index Class Name
Report
Doc Date
8/14/1995
From
DAMES & MOORE
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1 attention in writing to any revisions other than the corrections called for by CONTRACTOR on <br />previous SUBCONTRACTOR submittals. <br />' GC-22.0 CONTRACTOR APPROVAL OF SUBMITTALS <br />CONTRACTOR will review and take action on SUBCONTRACTOR submittals with reasonable <br />promptness. CONTRACTOR'S review and approval will be only for conformance with the <br />CONTRACTOR'S design concept for the compliance with the information given in the <br />' CONTRACT DOCUMENTS. CONTRACTOR'S review and approval shall not extend to <br />means, methods, techniques, sequences or procedures of construction (except where a specified <br />' means, method, technique, sequence or procedure of construction is required by the <br />CONTRACT DOCUMENTS). CONTRACTOR'S approval shall in no way relieve the <br />SUBCONTRACTOR from responsibility for errors or omissions in the submittal. Further, <br />' CONTRACTOR'S review and approval shall not release SUBCONTRACTOR from <br />responsibility for having complied with all requirements of the CONTRACT DOCUMENTS, <br />unless SUBCONTRACTOR has given CONTRACTOR specific written notice (by specific <br />notation on the submittal) of any variation in the submittal from the CONTRACT <br />DOCiJMEIV'TS, and CONTRACTOR has specifically approved the variation by notation on the <br />approval of the submittal. <br />GC-23.0 SUBCONTRACTOR'S PLANT. EQUIPMENT AND FACILITIES <br />SUBCONTRACTOR shall provide all plant and equipment required to complete the WORK in <br />accordance with the schedule. Prior to proceeding with erection of any temporary facilities, <br />SUBCONTRACTOR shall furnish appropriate information and receive CONTRACTOR'S <br />' approval. Unsatisfactory plant and equipment shall be removed from the SITE as directed by <br />the CONTRACTOR. Otherwise, SUBCONTRACTOR shall not remove construction plant or <br />equipment from the SITE before FINAL ACCEPTANCE of the WORK without <br />' CONTRACTOR'S written approval. CONTRACTOR shall not unreasonably withhold approval. <br />GC-24.0 MAINTENANCE AND PROTECTION OF WORK AND PROPERTY <br />SUBCONTRACTOR shall perform all WORK in a manner causing the least possible obstruction <br />or damage to public and private roads and properties. SUBCONTRACTOR shall preserve and <br />protect all vegetation on or adjacent to the SITE which does not um~easonably interfere with the <br />performance of the WORK. SUBCONTRACTOR shall maintain adequate protection of its <br />WORK from damage or loss and shall keep all property of CONTRACTOR, COMPANY and <br />other contractors free from unnecessary obstruction, damage or loss attributable to its operations. <br />Throughout the progress of its WORK, SUBCONTRACTOR shall provide and maintain all <br />protective measures required by any applicable regulations and prevailing conditions. <br />In the event of loss or damage, which arises in whole or in part from SUBCONTRACTOR'S <br />acts or omissions, SUBCONTRACTOR shall be responsible for its repair and shall complete the <br />WORK. Such repairs and completion of the WORK shall be performed as WORK under this <br />CONTRACT without additional compensation. <br />3-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.