Laserfiche WebLink
<br />I-8 EXCEPTIONS TO CONTRACT DOCUMENTS <br />If exceptions are not itemized by Bidder, it is assumed that the bidder's quotation conforms in <br />all respects with the CONTRACT conditions of the Request for Bid. <br />I-9 BID DOCUMENT SIGNATURES <br />Bidder will sign proposal documentation on page P-2 of Section P. Bidder will also initial each <br />ogee of Sections P and 2 at the bottom left. Any cross-0uts on any of the Section 2 pages will <br />also be initialed. <br />I-10 CONTRACTOR SAFETY QUESTIONNAIRE <br />Bidder will complete and sign Contractor Safety Questionnaire included herein as Appendix A. <br /> <br /> <br /> <br />L~ <br />i <br />t <br /> I-3 <br />' <br />