Laserfiche WebLink
..:,. <br />14. Rail Snur And Rail Yard - A rail spur leading from the main rail line into the <br />plant area has been constructed. The spur has not yet been tied into the main line or into the <br />plant rail yard. Construction of the plant rail yard is mostly complete. This trackage still needs <br />to be tied into the raw material delivery systems and the cement shipping systems. Neither the <br />spur or rail yard is yet accepting rail traffic. Reclamation of ground disturbance along the rail <br />spur is underway. <br />15. Office, Control Room, And Warehouse Buildin>?s -Work has started on the office <br />and parts warehouse buildings. Perimeter walls have been erected and the second floor of the <br />office building, where the control room will be located, is currently being constructed. <br />C. COMPLIANCE WITH ALL EXISTING PERMITS AND AUTHORIZATIONS <br />GCC believes it is in compliance with all applicable requirements. <br />DN:32128119 2 <br />