My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP03802
DRMS
>
Back File Migration
>
Report
>
REP03802
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:34:47 PM
Creation date
11/26/2007 10:37:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002004
IBM Index Class Name
Report
Doc Date
8/30/2007
Doc Name
Annual report & fee
From
GCC Rio Grande, Inc.
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />conveyor frames and rollers (no belt yet) from the reclaim tunnel (beneath the hoppers) to the <br />raw material storage building have also been installed. Construction of the underground dust <br />collection system on one of the truck dump hopper/reclaim tunnel designed to receive all the raw <br />materials except coal is in progress. <br />4. Raw Material Delivery and Handline Via Railcar -The two dump hoppers and <br />feeders used for the delivery of coal and gypsum/alumina/iron by rail and the associated reclaim <br />tunnel are largely completed. Construction of the partial structure in which the dump hoppers <br />will be enclosed is also underway. A belt conveyor frame and rollers from the reclaim tunnel <br />(beneath the hoppers) to a transfer tower east of the raw material storage building have been <br />installed. Belt conveyor frames and rollers leading from the transfer tower to the raw material <br />storage building have been installed. Construction of the belt conveyor leading from this transfer <br />tower to the gypsum limestone storage building has not yet started. <br />A partial belt conveyor frame and rollers for the reclamation of coal from the raw <br />material storage building has been installed. Eventually this belt conveyor will lead to a material <br />transfer tower that is can-ently under construction. Work remaining in this area includes <br />completion of a transfer tower and associated belt conveyors leading to the coal mill. Also, <br />structural, mechanical, and electrical work on these systems continues. <br />5. Gypsum and Limestone Stora¢e Building -The dump hopper, feeders, and <br />reclaim tunnel for reclaiming all of the gypsum and some limestone received via truck from the <br />on-site quarry (to be used for the limestone additions to the finish mill) is largely complete. <br />Construction of a transfer tower and associated belt conveyors leading to the gypsum limestone <br />bins in the finish mill is underway. Construction of the enclosed storage building for these <br />materials has not yet been completed other than concrete foundations and a short concrete <br />perimeter wall that will be used by a loader to push against during reclamation of these materials. <br />Structural, mechanical, and electrical work on all these systems continues. <br />6. Raw Material Storaee Buildine -The structure of the raw material storage <br />building has largely been completed including the tracks on which the longitudinal <br />stacker/reclaimer units will operate. This building will be equipped with one stacker unit and <br />two reclaimer units (one reclaimer for coal and the other for other raw materials). These units <br />are in the process of being installed and have been placed on the tracks but are not yet <br />completely functional. Mechanical and structural work on these systems continues. <br />Raw material reclaim belt conveyor frames and rollers leading from the raw <br />material storage building to a transfer tower west of the building have been installed. From this <br />transfer tower, belt conveyor frames and rollers leading to the raw material storage bins have <br />been installed. Four raw material storage bins (three active and one spare), other than for <br />limestone, have also been installed along with dust collection and weigh scales. As mechanical <br />and electrical work is ongoing on this system, it is not yet operational. <br />7. Vertical Raw Mill -Belt conveyor frames, rollers, and two transfer towers leading <br />from the raw material storage bins on the west side of the plant to the raw mill have been <br />installed. The dust collection system at the transfer towers has also been installed. A central bin <br />that accepts raw materials from the individual raw material bins and in turn feeds these materials <br />DN:32128119.2 <br />