Laserfiche WebLink
<br />ANNUAL RECLAMATION REPORT <br />MESA GRAVEL PIT <br />PEABODY COAL COMPANY <br />PERMIT N0. 82-36 <br /> <br />INTRODUCTION <br />The gravel from this operation is used at Peabody Coal Company's Seneca II Coal Mine for <br />road construction and road maintenance. During this reporting period (June 1, 1986 to <br />June 1, 1987) the production was zero with no additional disturbance or reclamation to <br />report. <br />The report period for this Annual Reclamation Report is from June 1, 1986 to June 1, 1987. <br />1. Location and number of acres affected during that year. See Exhibit 2.41 Annual <br />Reclamation Map. <br />RESPONSE: <br />Activity Acres <br />i Topsoil removed ahead of active pit 0.0 <br />Active pit area advance 0.0 <br />2. Location and number of acres reclaimed that year. <br />RESPONSE: <br />There were 0.0 acres reclaimed this year. <br />3. The location and number of acres in the various stages of reclamation (backfilled, <br />graded, topsoil replaced, revegeta ted). <br />RESPONSE: <br />No reclamation activities have been done during the last year. <br />4. The species of vegetation planted, the locations and approximate dates of planting. <br />RESPONSE: <br />No planting has been done during the last year. <br />