Henderson Mini Permit No. 77-342 <br />a February 12, 1 <br />page 3 <br />Grass seed and fertilizer were broadcast concurrently <br />with the topsoil spreading while seed bed receptivity was <br />high. Slopes seeded in early summer were showing grass <br />seedlings by the end of the growing season. <br />Shrub seeds were also planted in moist locations of East <br />Branch Reservoir shores and the seepwater entrapment canal, <br />areas 6 and 20 respectively. Tree density was increased with <br />the addition of 1,200 more plants in selected locations of <br />Area 20 and the topsoil berm (Area 21). Other areas with <br />sparse vegetation were spot reseeded with grass seed. <br />Salvage materials and construction buildings at Ryan's <br />camp (Area 12) and near the north topsoil stockpile (Area 21) <br />were removed in the fall. Totally, about one acre was <br />scarified, seeded and fertilized. <br />Phase I construction of Lost Creek Reservoir and ,pipe- <br />line right-of-way (Area 23) commenced in late spring with <br />timber clearing. About eight acres of construction <br />disturbance were final-graded in 1981 and were seeded ,snd <br />fertilized as construction was completed. Follow-up <br />revegetation will occur in 1982. Additional construction is <br />scheduled for the 1983 and the 1985 seasons. <br />Continued tailing deposition (Area 9) now affects about <br />567 acres. That figure and the acreage of other disturbances <br />inside the tailing basin (bypass canal, roads, pipelin~as, and <br />topsoil removal) total less than the 705 acres of antis:ipated <br />affected land designated for the tailing basin in the time- <br />table for December 1981. <br />Timber was also cleared from 15 acres of the topsoil <br />stockpile area (Area 21) on the northwest edge of the trailing <br />basin in preparation for further stockpiling. The timber was <br />made available to employees for firewood. <br />A road was cut through Area 18 to provide vehicule~r <br />access between No. 1 and No. 3 tailing dams. <br />Surety <br />An update of reclamation costs was completed in May, <br />1981, following approval in April, 1981, of the amended plan. <br />Receipt of the update to the bond was confirmed by the Mined <br />Land Reclamation Division on July 17, 1981. Therefore, no <br />update of costs is included in this annual report. The <br />biennial computation of costs for purposes of surety as <br />specified by the Board will be included in next year's annual <br />report. <br />