My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP03063
DRMS
>
Back File Migration
>
Report
>
REP03063
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:33:56 PM
Creation date
11/26/2007 10:25:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Report
Doc Date
2/28/1992
Doc Name
1991 ARR EXHIBIT 4 SEDIMENT PONDS INSPECTIONS
Permit Index Doc Type
ANNUAL RECLAMATION REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSPECTION REPORT - SEDIMENT PONDS <br />DISCHARGE POINT 001 - STREETER FILL SEDIMENT POND <br />Date of Inspection: ~/B• 9/ <br />Are all embankments, spillways and ewatering devices in order <br />as per the certified design? is <br />If no, explain: ~u •~ o !~« <br />DISCHARGE POINT 002 - WORK AREA POND <br />Date of Inspection: ~/b~• 9/ <br />Are all embankments, spillways and ewatering devices in order <br />as per the certified design~? Es <br />If no, explain: ,AOU o /E.v~ <br />DISCHARGE POINT 003 - GOSSARD LOADOUT POND <br />Date of Inspection: ~'/R•9/ <br />Are all embankments, spillways and dewatering devices in order <br />as per the certified designf~ ~rs <br />If no, explain: ~~-+ ~O ,1~~ <br />DISCHARGE POINT 004 - GULCH A POND <br />Date of Inspection: ~/R~9/ <br />Are all embankments, spillways and dewatering devices in order <br />as per the certified design? -_~ <br />If no, explain: ,~~._+ ~o s~ <br />DISCHARGE POINT 005 - STOKER COAL LOADOUT POND <br />Date of Inspection: A /A-9/ <br />Are all embankments, spillways and dewatering devices in order <br />as per the certified design? <br />If no, explain: ~ ~~O u~~ <br />DISCHARGE POINT 006 - GOSSARD LOADOUT LOOP <br />Date of Inspection: ~/A 9/ <br />Are all embankments, spillways and dewatering devices in order <br />as per the certified design? ~s <br />If no, explain: <br />TAYLOR PUMP HOLDING POND <br />Date of Inspection: Y/R ~/'/ <br />Are all embankments, spillways and ewatering devices in order <br />as per the certified desi n? <br />If no, explain: ,~c ~ f~ <br />Signed: ~~.fnl ~ci,3 <br />Date: ~/P 9/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.