Laserfiche WebLink
Doc Date:12H112001 INSPECTION REPORT - SEDIMENT PONDS <br />t xH~brr~l <br />POINT 001 - STREETER FILL SEDIMENT POND <br />Date of Inspection: fD •.~/~ 9/ <br />Are all emban3oaents, spillways a dewaterinq <br />as per the certified desig ? Gs <br />If no, explain: ., D <br />III IIIIIIIIIIIIIIII' <br />sss <br />ices in order <br />DISCHARGE POINT 002 - WORK AREA POND <br />Date of Inspection: /D;~/•f/ <br />Are all embankments, spillways an ewatering devices in order <br />as per the certified design? _ <br />If no, explain: <br />DISCHARGE POINT 003 - GOSSARD LOADOUT POND <br />Date of Inspection: /O ;~/• 9/ <br />Are all embanl~ents, spillways and ewatering devices in order <br />as per the certified design? <br />if no, explain: <br />DISCHARGE POINT 004 - GULCH A POND <br />Date of Inspection: /D~~/•9'/ <br />Are all embankments, spillways an ewatering devices in order <br />as per the certified design? <br />If no, explain: <br />DISCHARGE POINT 005 - STOKER COAL LO.T}DOUT POND <br />Date of Inspection: /O•~/•9l <br />Are all embankments, spillways an dewaterinq devices in order <br />as per the certified design? <br />If no, explain: <br />DISCHARGE POINT 006 - GOSSARD LOADOUT LOOP <br />Date of Inspection: /D •.7/•Y/ <br />Are all embankments, spillways an ewatering devices in order <br />as per the certified design? <br />If no, explain: <br />TAYLOR PUMP HOLDING POND <br />Date of Inspection: /D •.~/• 9~ <br />Are all embankments, spillways and ewatering devices in order <br />as per the certified design? <br />If no, explain: <br />~~a ~y~.~ ~r~ls <br />Signed: ~/in/ ~J~f~iif <br />Date: /~ •~/• 9l <br />