My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-09-16_REPORT - M1984099
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1984099
>
1994-09-16_REPORT - M1984099
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2022 1:53:48 PM
Creation date
11/26/2007 10:25:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984099
IBM Index Class Name
Report
Doc Date
9/16/1994
Doc Name
TECTONIC CONSTRUCTION CO BAILEY PIT PN M-84-099 ANNUAL REPORT FOR 1992
From
TECTONIC
To
DMG
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Perinittee Name: Tectonic Construction Co. Page 2 <br /> Permit No: M-84-099 <br /> Operation Name: Bailey Pit <br /> Anniversary Date: 09 129 194 <br /> (1) cont. <br /> acres ± south of the river where the conveyor terminal is in <br /> use and will be the last area mined as we pull out of the pit <br /> (both colored orange) . This staging area is used to store pit <br /> run materials until they are loaded on the conveyor for <br /> delivery to the plant. In Phase 1, 7. 97 acres ± is undis- <br /> turbed area that will become parts of Lakes 4 and 5 (dark <br /> green) , and 5.48 acres ± that is sod farm. <br /> (2) No reclamation was required this year. Backfilling is <br /> continuing in the WETLAND DEVELOPMENT AREA in the north lake <br /> (aqua) . We have approximately 11 . 50 acres filled in this area <br /> at this time. We have completed bank sloping into the <br /> excavation on the south lake, along the river and west side. , <br /> 4 . 65 acres ± (pink) . All of the north, west and south shores <br /> in Phase 1 are complete and revegetated. In addition 6. 84 <br /> acres along the river and west side of the excavation area was <br /> seeded with the approved mixture this year. The seeding north <br /> of the river is successful, on the south the seed took in <br /> placed and did not do well in other. We suspect this was due <br /> to the lack of moisture after the site was seeded. We will <br /> monitor it for another growing season and if needed reseed in <br /> the spring of 1996. <br /> The list below shows the total acres under various stages of <br /> reclamation. We have approximately 52 , 100 YD3 Of soil <br /> stockpiled on the site south of the river. We estimate that <br /> if mining ceased today, 37, 800 YD3 would be needed for <br /> recoiling purposes. Most of the reclamation in the mined <br /> areas north of the river is complete. Only the east shore of <br /> Lake 1 is left to complete at this time. This can not be done <br /> until the plant site areas is mined because we are still <br /> working in this aLea. <br /> a. Backfilled: 11 . 50 ac. (aqua) <br /> b. Graded: 28 . 40 ac. <br /> C. Seeded: 24 . 29 ac. (green) <br /> e. Lake Surface: 42 . 96 ac. (blue) <br /> d. Topsoil Replaced: 28 . 40 ac. <br /> f. Sod farm 5 . 48 ac. (light green) <br /> g. Ave. topsoil depth 12 . 00 in. <br /> (3) Mining will continue in the Lake #2 area stripped this year. <br /> We will mine along the west side of the entrance road and pull <br /> back towards the conveyor terminal area. We expect to mine <br /> 12 . 50 acres ± this year in that area (yellow) , if additional <br /> area is needed we will start mining the area stripped (cross <br /> hatched) . <br />
The URL can be used to link to this page
Your browser does not support the video tag.