My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-09-16_REPORT - M1984099
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1984099
>
1994-09-16_REPORT - M1984099
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2022 1:53:48 PM
Creation date
11/26/2007 10:25:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984099
IBM Index Class Name
Report
Doc Date
9/16/1994
Doc Name
TECTONIC CONSTRUCTION CO BAILEY PIT PN M-84-099 ANNUAL REPORT FOR 1992
From
TECTONIC
To
DMG
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-� • � : • III IIIIIIIIIIIIIIII <br /> yC 999 <br /> m RECEIVED <br /> W � SEP 16 04 <br /> September 7 , 1994 1,I1,I�. .. <br /> S1011 cl nlmetais tx Geology <br /> Mrs. Barbara Chiappone <br /> Division of Minerals and Geology <br /> Minerals Section <br /> 1313 Sherman Street Suite 215 <br /> Denver, Colorado 80203-2273 <br /> Dear Mrs. Chiappone: <br /> Re: Tectonic Construction Company <br /> Bailey Pit, M.L.R. Permit No. M-84-099 , <br /> Annual Report for 1992 <br /> FEDERAL TAX ID# <br /> Our files indicate that the anniversary date for this <br /> permit is September 291h. Operations continued as approved in the <br /> permit and is in compliance with the Technical Revision of <br /> September, 1991 . /This pit HAS NOT been granted a Temporary <br /> Cessation and it HAS operated more than 180 days this year. The <br /> Financial Warranty for this operation is $73 , 000, the permitted <br /> area is 216. 81 ac. ± and the pit is divided into 2 Reclamation <br /> Phases. A sign that conforms with rule 6.7 Signs and Markers is in place <br /> at the entrance to the pit. Please refer to the Annual Report map <br /> for the location of areas discussed in this report. <br /> We will deal specifically with the Annual Report requirements <br /> as outlined in Rule 1. 15 of the Rules and Regulations, amended <br /> April, 1994 . <br /> (1) Mining continued in Phase 2 south of the river, this year. An <br /> area approximately 11 . 03 acres ± partially mined along the <br /> west and south sides of the south lake (tan) . The topsoil <br /> stripped from the area was stockpiled around the perimeter of <br /> the excavation on the south and east sides (brown) . In <br /> addition we have topsoil piles located around the disturbed <br /> area for use in reclamation later. We have 19 . 73 acres ± <br /> stripped ready for mining next year (cross hatched) . The 21.77 <br /> ± Plant Site north of the river and a staging area of 6 . 19 <br /> Tectonic Construction Co. 1 <br /> 12501 t County Road 13 <br /> Longmont, <br /> Colorado 80501 <br /> (303) 444-7444/ 1-303-5363350 An Equal Opportunity Employer (�\o <br />
The URL can be used to link to this page
Your browser does not support the video tag.