Laserfiche WebLink
J. Dillie <br />Page 2 <br />March 7, 1995 <br />BMRI has been required to supplement the formal monthly <br />sampling with weekly reports of daily on-site analysers <br />completed by BMRI, correlated with twice monthly laboratory <br />analyses. Active pond samples were to be taken dail}~ and <br />inactive samples weekly. Because there is no longer an active <br />and inactive pond, BMRI will no longer be taking separate <br />samples. All future daily samples taken of the tailings pond <br />will include the upper and lower disposal. <br />Sincerely, <br />W _ <br />Sall ayes <br />Environmental Engineer <br />cc: Anne Baldrige <br />Dan Robertson <br />Alana Scott <br />