My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP02885
DRMS
>
Back File Migration
>
Report
>
REP02885
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:33:46 PM
Creation date
11/26/2007 10:22:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
3/10/1995
Doc Name
BATTLE MOUNTAIN RESOURCES INC PN M-88-112 SAN LUIS PROJECT SPLITTER EMBANKMENT
From
BMRI
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIIIIII <br />BATTLE MOUNTAIN RESOURCES, INC. <br />March 7, 1995 <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br /> <br />MAk 1995 <br />,~. SiDn ILE M110lXJ1AN! <br />n;cal~'Ueoio9Y <br />Re: Battle Mountain Resources, Inc. -- San Luis Projiect <br />DMG Permit No. M-88-112 <br />splitter Embankment <br />Dear Mr. Dillie: <br />As you noticed during your February 27, 1995, site inspection, <br />the San Luis Mine no longer has a distinguishable upFoer and <br />lower pond. This is because the splitter embankment is slowly <br />being covered with tails. The purpose of the splittesr <br />embankment was to divide the ponds into two segments during <br />the initial disposal period when the disposal area <br />approximated the valley floor and was at the narrowest point. <br />The purpose of the splitter embankment was for ease c,f <br />operations in reclaiming water. The splitter embankment did <br />not serve as any sort of structural integrity. See I).6.1 of <br />the approved permit. According to the approved permit, phase <br />2 of the tailings disposal area would create a singles disposal <br />area because of deposition of the tailings over the t.op of the <br />splitter embankment. <br />A.SUB.SIDIARY OF flA7TLF. AfOUATA/N GOID COMPANY <br />P.O. BOX 310 SAN LUIS, COLORADO 81152-0710 1719) 672-3362 FAX (719) 67?3363 <br />
The URL can be used to link to this page
Your browser does not support the video tag.