My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP02725
DRMS
>
Back File Migration
>
Report
>
REP02725
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:33:35 PM
Creation date
11/26/2007 10:18:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
8/8/2001
Doc Name
BATTLE MTN RESOURCES INC DMG PN M-88-112 JULY MONTLY SAMPLING
From
BATTLE MTN RESOURCES INC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On July 8'h the pump in well BF-5 stopped. An effort was made to remove the pump and replace it but <br />with no success. We think that either the well casing has a "dog leg" at about 25 feet or the electrical <br />wiring has become entangled with the pump and is wedged in between the pump and the casing. <br />While this pump was down and maintain the required level in the back fill, a pump was installed in <br />well BF-6 on July 25'n <br />We are still in the process of trying to remove the pump from BF-5, when this is accomplished a new <br />pump will be installed. <br />The Performance Monitoring Program results, ground water well water quality time series plots, <br />previously reported on a monthly basis are now reported quarterly. The June monthly report was <br />sent but nothing will be received until the end of the third quarter. <br />Since . , <br />David E. Long <br />Environmental Coordinator <br />cc: Bill Lyle <br />Enclosure <br />File <br />
The URL can be used to link to this page
Your browser does not support the video tag.