Laserfiche WebLink
<br />10.7 Certification Report <br />The Engineer will submit monthly reports to the Owner. In addition, at the completion of the <br />project, the Engineer shall submit a final certification report. These reports shalt certify that the <br />work has been performed in compliance with the construction drawings and Specifications. <br />At a minitnum, the monthly and final reports shall contain: <br />• A summary of all construction activities; <br />• Third Party Laboratory test results; <br />' • Observation and test data sheets; <br />• Sampling and testing location plans; <br />' A description of significant construction problems and the resolution of these problems; <br />• A list of changes from the construction drawings and Specifications, and the justification <br />for these changes; <br />• Record drawings; <br />• A certification statement signed and sealed by an engineer registered in that State. <br />' The record Drawings shall accurately locate all construction items, including the location of <br />settlement markers, survey monuments, etc. <br />1 <br /> <br /> <br /> <br /> <br />1 <br />1 <br /> <br /> <br />_21 _ <br /> <br />