My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP02168
DRMS
>
Back File Migration
>
Report
>
REP02168
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:33:01 PM
Creation date
11/26/2007 10:10:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
2/16/1996
Doc Name
APPENDIX C EARTHWORKS SPECIFICATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />10.7 Certification Report <br />The Engineer will submit monthly reports to the Owner. In addition, at the completion of the <br />project, the Engineer shall submit a final certification report. These reports shalt certify that the <br />work has been performed in compliance with the construction drawings and Specifications. <br />At a minitnum, the monthly and final reports shall contain: <br />• A summary of all construction activities; <br />• Third Party Laboratory test results; <br />' • Observation and test data sheets; <br />• Sampling and testing location plans; <br />' A description of significant construction problems and the resolution of these problems; <br />• A list of changes from the construction drawings and Specifications, and the justification <br />for these changes; <br />• Record drawings; <br />• A certification statement signed and sealed by an engineer registered in that State. <br />' The record Drawings shall accurately locate all construction items, including the location of <br />settlement markers, survey monuments, etc. <br />1 <br /> <br /> <br /> <br /> <br />1 <br />1 <br /> <br /> <br />_21 _ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.