Laserfiche WebLink
<br />1 Any notice to or demand upon the Contractor shall be sufficiently given if delivered at the office <br />of the Contractor, stated on the signature page of the agreement (or at such other office as the <br />' Contractor may from time to time designate in writing to the Owner), or if deposited in the <br />United States mail in a sealed, postage-paid envelope, or delivered with charges prepaid to any <br />' telegraph company for transmission, in each case addressed [o such office. <br />2.6 Schedule of Work <br />' The Contractor shall develop a schedule of work for the Owner's approval :o complete the <br />' construction. In no instance shall approval by the Owner be considered to absolve the Contractor <br />from the responsibility of performing the required work or of protecting the •NOrk in interim <br />work stages, or from protecting the work completed prior to final acceptance try the Owner. <br />' The following is a suggested general work sequence for constructing the faciliti~;s shown on the <br />Drawings. It is intended as a guideline for the Contractor to develop his own work sequence in <br />conjunction with that of the Owner to suit construction equipment and manpower scheduling and <br />meet design requirements. Additional activities required to complete the work, a: outlined within <br />' the Specifications and as shown on the Drawings, shall be added by the Contractor. <br />' • Develop access roads to work areas, as needed. <br />• Develop a site drainage plan and maintenance scheme. <br />• Prepare the embankment and tailings disposal beach area foundation fot fill placement. <br />' • Place embankment raise fill. <br />• Install permanent survey monuments. <br />' • Complete final grading and site cleanup. <br />The Engineer/Owner reserves the right to modify the Contractor's planned schedule at the time <br />' of its submission to meet the overall project requirements. The schedule for embankment raise <br />fill placement may be subject to revision by the Engineer based on the data l;rovided by the <br />settlement markers described in Section 9.0 of these specifications. <br />' The Contractor shall submit the schedule developed concurrently with his bid. The schedule must <br />clearly identify the critical path of activities necessary to complete the design.rted work. The <br />schedule submitted shall be in accordance with the actual calendar days on which actual work <br />will be performed. The schedule shall be detailed to identify all work activities, critical <br />' milestones, and float times. At a minimum, all activities addressed by these Specifications shall <br />be incorporated into the schedule. The schedule shall become part of the contr;tct documents. <br />' -5- <br />t <br />